Mon–Fri 7:00 a.m.–7:00 p.m. ET · Emergency dispatch 24/7 1 (833) 750-0800 hello@totalprintusa.com
  1. Home
  2. Case studies

Results from fleets that were tired of downtime

A look at how clinics, school districts, and job-site teams tightened uptime, supplies, and support.

Healthcare

Midwest Health Network reduced tickets and supply waste

A 14-clinic group moved from three dealers to one managed program with secure release and a tighter device mix.

41%fewer emergency tickets
27%lower supply spend
18sites on one SLA
Read case study
Education

Lakeside School District tamed campus volume and summer surprises

A mid-size district scheduled preventative work in the summer and introduced quotas so labs opened ready in August.

32%less unplanned downtime
1district-wide program
0August lab delays
Read case study
Construction

Summit Construction kept job-site printing moving with the trailer

A commercial contractor needed support for trailers that change address and for occasional wide-format work.

6 wkaverage site move
same daytypical dispatch goal
1named coordinator
Read case study
WhatsApp
Call 1 (833) 750-0800