- Home
- Case studies
- Education
Lakeside School District tamed campus volume and summer surprises
A mid-size district scheduled preventative work in the summer and introduced quotas so labs opened ready in August.
32%less unplanned downtime
1district-wide program
0August lab delays
The situation
Copiers failed in the first week of school because summer was treated as a pause, not a maintenance window. Labs also ran without any quota, so a few classrooms absorbed a surprising share of color pages.
What we did
We built a summer PM calendar around construction, standardized device images, and introduced optional student release and quotas where principals wanted them.
The result
Labs came up on time in August. Ticket volume in September dropped, and the district could finally see which buildings were driving color cost.